Development

 

Custom solution or product family? Welded construction or modular system? Extreme climate, underground, earthquake zone, or shipbuilding? We develop the right switchgear from concept to series production.

 

We analyze the expected lifetime costs of the products right from the concept stage. This reduces operating costs for the user. We offer you solid sales arguments. Environmentally friendly designs and environmentally friendly fluids guarantee sustainability.


The selection of energy-efficient, new technologies in container construction and insulators ensures cost-effective production in the long term. Multifunctional designs within the main current path reduce material costs. The consistent use of the weakly inhomogeneous field in single-material and multi-material insulation in our designs leads to a reduction in the installation space required for high-voltage components.


Selection of previous developments:


  • 12kV, 24kV and 40,5/42kV primary switchgear up to 31,5kA, 2500A, according  to IEC62271-200 and DL standards, N2-GI;  IEC62271-200
  • 72,5kV primary switchgear LP-GIS and N2-GIS;  IEC62271-203
  • 12kV and 24 kV primary switchgear solid insulations IEC62271-200
  • 12kV/24kV/36kV RMU N2-GIS and AIR-GIS, including fuse combinations IEC62271-200, -100, -102, -103, -105
  • 12kV/24kV/36kV/42kV -AIS IEC62271-200, -100
  • 12kV/17,5kV/24kV RMU and Primary AIS and CB optimizations IEC62271-200, -100
  • 12/24/42kV breakers and fuse combinations (Solid/Air-isolation combination) 2500A, 31,5kA
  • 17,5kV, 80kA, 4000A IEC62271-200 AIS Generator-switchgear
  • Complete stations according to IEC62271-202 for all climate ranges
  • 2poles Railway-Switches for 16 2/3 Hz





Concept


  • Cost analysis
  • Material selection
  • Market analysis
  • Concept comparisons


iStock-915515058




Engineering


  • CAD design
  • Simulation (strength, thermal, flow, electric fields, arc fault pressure calculation, multi-physics, etc.)
  • Drawing creation
  • Bills of materials

 

Stecker 01
002
1
007
Stromdichte_Stromschiene_LS
Bild 1
Bild 08
Bild 04

 



 


Prototype construction

 

  • Parts/Assembly Manufacturing
  • Assembly
  • Preparations for Series Production


051
021
020
IMG_0433
106-2
main-services-4
Bild 17
Bild 14


Examination


  • Testing in accredited testing laboratories
  • Test support
  • Circuit breakers according to IEC 62271-100
  • Earthing and disconnecting switches according to IEC 62271-102
  • Load-breakers and circuit-breakers
  • Factory-assembled compact substations according to IEC 62271-202
  • Switchgear according to IEC 62271-200, -203
  • Temperature test according to IEC 62271-1, -304
  • Seismic test according to IEC 62271-207, -300
  • Further tests according to DLT, GB, GOST, IEEE, GL, ANSI upon request



103-2
101-2
102-2
100-2
IMG_1058_schmal




 
 
 
Mail
Call
Map
About