Special machine construction
Custom solution or product family? Welded construction or modular system? Extreme climate, underground, earthquake zone, or shipbuilding?
We analyze the expected lifetime costs of the products right from the concept stage. This reduces operating costs for the user. We offer you solid sales arguments. Environmentally friendly designs and environmentally friendly fluids guarantee sustainability.
Concept
- Cost analysis
- Material selection
- Market analysis
- Concept comparisons
Engineering
- CAD design
- Simulation (strength, thermal, flow, electric fields, arc fault pressure calculation, multi-physics, etc.)
- Drawing creation
- Bills of materials
Prototype construction
- Parts/Assembly Manufacturing
- Assembly
- Preparations for Series Production
Examination
- Testing in accredited testing laboratories
- Test support
- Circuit breakers according to IEC 62271-100
- Earthing and disconnecting switches according to IEC 62271-102
- Load-breakers and circuit-breakers
- Factory-assembled compact substations according to IEC 62271-202
- Switchgear according to IEC 62271-200, -203
- Temperature test according to IEC 62271-1, -304
- Seismic test according to IEC 62271-207, -300
- Further tests according to DLT, GB, GOST, IEEE, GL, ANSI upon request